| Sign In | Join Free | My tjskl.org.cn | 
              
  | 
      
Brand Name : YDX
Model Number : YDX-5SE
Certification : CE ISO SGS
Place of Origin : CHINA,QINGDAO
MOQ : 10-10000 square meters
Price : $30.00-$65.00
Payment Terms : T/T
Supply Ability : 10000 tons/month
Delivery Time : 20-30 works days
Packaging Details : Exported standard packing
Construction : Steel Frame
Working Scope : Design,Fabrication, Installation
Product Sustainability : Eco-Friendly
Environment Protection : Environmental Friendly Material
Type : Frame Building
Door : Sliding Door or Rolling Door
Structure Type : Frame
Frame Type : Steel Frame
Earthquake Resistance : Strong
Windows : Aluminum
Seismic Design : High Seismic Zone
Installation Time : Short
Aesthetics : Modern
Construction Type : Frame
Cost : Moderate
Product Resistance : Corrosion Resistant
Finish : Galvanized/Painted/Cladding
Roof : Glass Wool, EPS, PU
Product Fire Resistance : Fireproof
Comprehensive 3D Tekla modeling services
Specialized thick paint application with dedicated indoor painting facilities
Product Specifications
| Product Application | |||
| Light Frame Steel Construction Hangar Design Prefabricated Steel Structure Factory Building Workshop warehouse | |||
| A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding! | |||
| An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework. | |||
| SPECIFICATION FOR STEEL STRUCTURE BUILDING | |||
| Main Steel Frame | Steel Column & Beam | 1. Material: Q345B (S355JR) or Q235B(S235JR)/ Welded/Hot Rolled H section steel | |
| 2. Surface: Hot Dip Galvanized or Painted; | |||
| 3. Connection: All Bolts Connection; | |||
| Supporting System | Roof Purlin | C or Z Section Steel, Q235B | |
| Wall Purlin | C or Z Section Steel, Q235B | ||
| Bracing | Steel Rod, Q235B | ||
| Cross Support | Steel Rod, Q235B | ||
| Column Support | Angle Steel; Steel Rod; Q235B | ||
| Angle Brace | Angle steel,Q235B | ||
| Tie Bar | Steel Pipe,Q235B | ||
| Roof & Wall System | 1. Single Colorful Corrugated Steel Sheet; Thickness: 0.3-0.8mm  |  ||
| 2. Sandwich Panel with EPS, Rock Wool, Fiberglass,PU; Thickness: 50-150mm;  |  |||
| Accessories | Door | Sliding; Rolled Up Door (Manual/Auto) | |
| Window | Aluminum Alloy; PVC; | ||
| Downspout | PVC pipe; | ||
| Gutter | Galvanized Steel Sheet; Stainless Steel | ||
| Ventilator | Stainless Steel Turbine Ventilator | ||
| Skylight Belt | FRP or PC semi-transparent Skylight Belt | ||
| Flash | Color Steel Sheet | ||
| Fittings | Anchor Bolt; High Strength Bolt; Standard Bolt, Self-tapping nail etc | ||



Our Advantages
| 1. Professional Design Team | We provide customized design services based on your requirements or calculate steel quantities from your existing drawings. | 
|---|---|
| 2. Skilled Fabrication | Our advanced equipment and trained workforce follow project-specific production schedules with pre-fabrication training. | 
| 3. One-Stop Service | We offer complete project solutions with extensive experience in customized steel structure projects. | 
| 4. Quality Control | Dedicated QC team ensures products meet all specifications and requirements. | 
| 5. After-Sales Service | Comprehensive support including maintenance services for insulation and steel components. | 
The following question we need to know before making the price. Just feel free to fill what you know.
| 1 | Location (where will be built?) | _____country, area | 
| 2 | Size: length*width*height | _____mm*_____mm*_____mm | 
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s | 
| 4 | snow load (max. snow height) | _____kn/m2, _____mm | 
| 5 | anti-earthquake | _____level | 
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high | 
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former  |  
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm | 
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm | 
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m | 
| 
                                             | 
                
                        Heavy Industrial Steel Frame Building with H Section Design Images |